Skip to main content

Highway network management

Road and pavement programme of works

The programme is based on inspections carried out through the year and suggestions made by local Councillors and Parish Councils.

2022 - 2023 works programme

The list of carriageway resurfacing sites is compiled using a scoring matrix based on a number of measureable criteria, to ensure that the roads in the worst condition are prioritised across the Authority. Each road in the Bedford Borough road network is assessed and scored on an annual basis.

2021 - 2022 works programme

The list of carriageway resurfacing sites is compiled using a scoring matrix based on a number of measureable criteria, to ensure that the roads in the worst condition are prioritised across the Authority. Each road in the Bedford Borough road network is assessed and scored on an annual basis.

2020 - 2021 works programme

2019 - 2020 works programme

We then evaluate these requests against:

  • condition of the road
  • benefits to residents and local economy
  • carrying out works that ease the burden of small scale repair works facing the Council

In addition to these repairs, we also:

  • maintain highways bridges
  • carry out works to improve highway drainage and prevent flooding
  • carry out street lighting improvements:

National Highway and Transport Public Satisfaction Survey

The reports summarise Bedford Borough Council's results in the National Highway and Transport (NHT) Public Satisfaction Survey.

On this page